Full-cycle build · corrected & validated

The whole machine, on one page.

Architecture through audit: five clusters, a 104-address layer space, RIBA equivalence, twenty-two approval classes, the 365-day workflow, fourteen control KPIs, the read-only API surface and the evidence ledger that still has two critical gaps in it.

5Clusters
104Layers
22Approval classes
32Evidence packs
14KPIs

01 — Architecture

Five clusters, manifest-confirmed.

Twenty-five agents grouped by the work they own. No cluster borrows another's authority, and assurance sits outside all of them.

Enterprise/Governance

perimeter, evidence, authority, portfolio

A00A01A02A03A04A08A21

Pre-Construction

bid-to-contract, permits, sourcing

A05A06A09A13

Technical & Delivery

engineering, quality, HSE, site, handover

A07A10A12A14A15A16A20

Commercial/Financial

baseline, change, cash

A17A18A19

Assurance & Optimization

credentials, systems, mining, independent challenge

A11A22A23A24

02 — Business sectors

Roads & infrastructure

ACTIVE

Subbiya Highway, Northern Industrial Area, micro-tunneling & CCTV divisions

Buildings & housing

ACTIVE

Housing, public buildings, mixed developments

Oil & gas

ACTIVE

KOC, KNPC, Joint Operations — injection networks, AIV infrastructure (2026)

Water & energy

ACTIVE

Water & power sector delivery

Production & services

ACTIVE

Asphalt plants 440 t/h, ready-mix 160 m³/h, QC labs

Real estate

CONDITIONAL

Combined International Real Estate entity — conditional wave

03 — Layer space · A → ZZZZ

104 addressable IDs, four depths.

Every record resolves to a four-depth address, from business domain down to the primary evidence that proves it.

XE · Enterprise

Scope layer

Top-level business or delivery domain.

XXEG · Enterprise Governance

Process layer

Process family within a domain.

XXXEGA · Approval Gate

Control layer

Approval, gate, handoff or bounded workflow layer.

XXXXEGA1 · Signed Minute

Governance layer

Traceable transaction, document, test, output or closeout evidence.

Domains in use: Governance, Commercial, Technical, Evidence, Delivery, HSE, Finance, Assurance.

04 — RIBA ↔ lifecycle

Architectural stages, wired to agent rules.

International equivalence so an architectural programme and a contractor delivery programme address the same records.

0

Strategic Definition

L00 — Strategy & Portfolio Entry

1

Preparation & Briefing

L01–L02 — Opportunity, Bid/No-Bid, Tender

2

Concept Design

L04–L05 — Mobilization, Engineering & Design

3

Spatial Coordination

L05–L06 — Design Coordination, Permits

4

Technical Design

L06–L07 — Work-Front Readiness, Procurement

5

Manufacturing & Construction

L08–L10 — Production, Construction, Inspection

6

Handover

L13–L14 — Commissioning, Defects, Final Account

7

Use

L15 — Operate, Learn, Portfolio Feedback

05 — Approvals · NIC · NOCs

Twenty-two classes. Structure only.

Every class carries maker ≠ checker, explicit human approval and signed source evidence. No monetary limit is configured anywhere.

AP-08 · NIC — blocked for live routing

Definition pending (F-06). NOC, NCR and RFI never substitute NIC. All monetary thresholds are NOT PROVIDED — DO NOT INFER (F-05). Status: PROPOSED — NOT AUTHORIZED.

AP-01Bid/no-bid
AP-02Tender price / submission
AP-03Contract execution
AP-04Budget baseline / rebaseline
AP-05Design / shop drawing
AP-06Method statement / ITP
AP-07Permit / NOC
AP-08NIC workflow — BLOCKED
AP-09Supplier / subcontractor onboarding
AP-10Purchase order / subcontract
AP-11Goods / material acceptance
AP-12Work inspection / hold-point release
AP-13NCR disposition / closure
AP-14Variation instruction / quotation
AP-15Payment application / valuation
AP-16Supplier payment
AP-17Plant fitness / lifting / temporary works
AP-18Recruitment / appointment / delegation
AP-19Handover / final account / release
AP-20Investment / development / asset disposal
AP-21IT access / integration / software license
AP-22Internal audit / assurance release

06 — 365-day workflow

P1–P4, G0–G10, and the cadence between them.

Four phases, eleven gates, and a fixed operating rhythm. Nothing in the cadence replaces a contractual, issuer or legal deadline.

P1FoundationDays 1–90
P2Vertical pilotDays 91–180
P3Scale & controlDays 181–270
P4Steady stateDays 271–365
Daily

Work-front status · HSE pre-checks · permit readiness

A16 · A12 · A09

Weekly

Constraint review · evidence-pack sweep · credential 30-day tier

A00 · A01 · A11

Monthly

Cash realization KPI-12 · change reconciliation KPI-11 · 60-day tier

A19 · A18 · A11

Quarterly + annual

Authority-boundary audit · RACI refresh · day-365 full review

A24 · A08 · A03

G0

Enterprise perimeter

A00/A02/A04

Days 1–45 VERIFIED (sample)
G1

People & responsibility

A03/A08

Days 8–45 EVIDENCE PENDING (DR-04 — F-05 OPEN)
G2

Opportunity to contract

A05/A06/A08

Days 91–110 MODEL READY
G3

Engineering & permissions

A07/A09

Days 106–125 NIC BLOCKED (F-06)
G4

Method / quality / HSE

A10/A11/A12

Days 106–160 MODEL READY
G5

Procurement & logistics

A13/A14/A15

Days 120–140 MODEL READY
G6

Construction delivery

A16/A17

Days 135–160 MODEL READY
G7

Changes & cash

A18/A19

Days 110–180 MODEL READY
G8

Handover & defects

A20

Days 161–180 MODEL READY
G9

Systems & process mining

A22/A23

Days 181–210 DATA PENDING (50% coverage)
G10

Independent assurance

A24

Days 61–365 RELEASE RECOMMENDED WITH EXCEPTIONS

07 — Measurement matrix

Fourteen KPIs. Zero baselines set.

A KPI without a proven denominator is not a measurement. Every baseline stays unset until coverage is demonstrated — that is the G9 rule, not an oversight.

KPI Measure Owner State
KPI-01 Critical data completeness CGC-A01 Baseline not set
KPI-02 Role / deliverable accountability CGC-A03 Baseline not set
KPI-03 Approval elapsed time CGC-A08 Baseline not set
KPI-04 Process waiting share CGC-A23 Baseline not set
KPI-05 First-pass submission acceptance CGC-A05 Baseline not set
KPI-06 Inspection first-pass acceptance CGC-A10 Baseline not set
KPI-07 NCR closure and recurrence CGC-A10 Baseline not set
KPI-08 Required-credential verified coverage CGC-A11 Baseline not set
KPI-09 On-time material availability CGC-A14 Baseline not set
KPI-10 Plant availability / utilization CGC-A15 Baseline not set
KPI-11 Change recovery state CGC-A18 Baseline not set
KPI-12 Cash realization / certification lag CGC-A19 Baseline not set
KPI-13 Net verified improvement value CGC-A23 Baseline not set
KPI-14 Agent evidence accuracy / boundary compliance CGC-A24 Baseline not set

08 — Agent skills

CGC-A00GAPS

Enterprise Orchestrator

coordinationcoverageescalation
CGC-A01PASS

Evidence Intake & Document Control

intakerevisionsmanifest
CGC-A02GAPS

Legal Entities & Corporate Governance

entitiesmandatesgovernance
CGC-A03PASS

Organization, People & RACI

RACIpeoplesegregation
CGC-A04GAPS

Business Sectors & Project Portfolio

sectorsprojectsdelivery-model
CGC-A05PASS

Tendering, Estimating & Bid Governance

BOQratesbid-risk
CGC-A06GAPS

Contracts & Commercial Obligations

obligationsnoticesprecedence
CGC-A07PASS

Engineering, BIM & Constructability

BIMconstructabilityRFIs
CGC-A08PASS

Approvals & Delegation of Authority

DoAauthoritysegregation
CGC-A09GAPS

Permits, NOCs & NIC Definition

NOCreadinessNIC-blocked
CGC-A10PASS

QA/QC & Construction Methodology

ITPinspectionNCR
CGC-A11PASS

Certifications, Accreditation & Licensing

verificationrenewalscope
CGC-A12PASS

HSE & Environmental Controls

hazardscontrolsincidents
CGC-A13PASS

Procurement & Subcontract Governance

sourcingeligibilitycommitment
CGC-A14PASS

Materials, Warehousing & Logistics

genealogyreceiptsquarantine
CGC-A15GAPS

Plants, Fleet & Production

capacitymaintenancebatch
CGC-A16PASS

Site Delivery & Productivity

work-frontsproductivityconstraints
CGC-A17GAPS

Planning, Cost & Project Risk

baselinecostforecast
CGC-A18GAPS

Variations, Claims & Change Control

noticesvariationsstates
CGC-A19PASS

Finance, Treasury & Payment Controls

work-to-cashretentionbank-release
CGC-A20GAPS

Commissioning, Handover & Defects

commissioningdefectscloseout
CGC-A21PASS

Real-Estate Development & Asset Lifecycle

mandatesentity-scopedconditional
CGC-A22GAPS

Systems, Data Security & Software Licensing

least-privilegelicensingread-only
CGC-A23GAPS

Process Mining & Workflow Optimization

event-logsqueuesbaseline
CGC-A24GAPS

Independent Assurance & Agent Validation

challengesamplingKPI-14

09 — API surface

Eight endpoints. Localhost, token-gated, read-only.

Reference documentation for the separate local runtime. This page does not call it: there is no console here and nothing on this site executes an agent.

The runtime binds 127.0.0.1 only and performs zero writes to external systems. To use the agents without any runtime at all, download the packs and install them in your own assistant.

Method Endpoint Out
GET /api/v1/health status, agents, NIC state, read-only declaration
GET /api/v1/agents 25-agent registry + handoffs
GET /api/v1/agents/{id}/selftest agent's functional self-test result
POST /api/v1/agents/{id}/run status, checks, findings, handoffs, blocked[]
GET /api/v1/gates G0–G10 register with blockers
GET /api/v1/evidence DR ledger statuses
GET /api/v1/telemetry run log (agent, status, elapsed, task)
GET /api/v1/boundaries hard-blocked action classes

10 — Evidence ledger

Thirty of thirty-two received. Receipt ≠ validity.

DR-04 (signed delegation of authority) and DR-10 (NIC definition) are unreceived, which is exactly why F-05 and F-06 remain open and why thresholds and NIC routing stay blocked.

DR-01
DR-02
DR-03
DR-04
DR-05
DR-06
DR-07
DR-08
DR-09
DR-10
DR-11
DR-12
DR-13
DR-14
DR-15
DR-16
DR-17
DR-18
DR-19
DR-20
DR-21
DR-22
DR-23
DR-24
DR-25
DR-26
DR-27
DR-28
DR-29
DR-30
DR-31
DR-32

11 — Dashboards

Agent fleet

PASS13 / 25
Gaps — evidence-driven12 / 25

Evidence ledger

Received30 / 32
Critical unreceivedDR-04 · DR-10

KPI baselines

Baselines set0 / 14
ReasonCoverage not proven (G9)

Cycle execution

Agent runs6,789
Boundary probes blocked4 / 4

12 — Security

Defense in depth.

Four layers that all have to hold: the token gate, the boundary guard, read-only semantics and the truth rules that stop a clean-looking answer from hiding a missing record.

Token gate

X-CGC-API-Key on every call; environment-rotatable; 401 on failure. The token lives in cgc_platform.env, never in page source.

Hard boundaries

NIC routing · threshold invention · signing and settlement · payments · permit granting · hold-point release · A21 scope — all 403 in the guard layer, verified 4 of 4 by probe.

Read-only semantics

The runtime binds 127.0.0.1 only; zero writes to external systems; no secrets in requests or responses; least-privilege access throughout.

Truth rules

Receipt ≠ validity. A zero denominator is not applicable, never 100%. Public claims are labeled, conflicts are flagged, and the review date is fixed at 2026-09-11.

13 — Audit

Findings, probes and the integrity position.

The platform reports against itself. Ten findings are open, two of them critical, and the boundary probes are logged with their dates.

F-01CRITICAL · OPEN

Governance conflict — one vs two independent directors

F-02HIGH · OPEN

Plant capacity figures conflict — nameplate vs actual

F-03HIGH · OPEN

License coverage claims exceed evidenced scope

F-04MEDIUM · OPEN

Credential scope mismatch risk across entities

F-05CRITICAL · OPEN

Delegated authority evidence missing — no thresholds

F-06CRITICAL · OPEN

NIC definition unresolved — routing blocked

F-07MEDIUM · OPEN

Personnel/roster evidence incomplete

F-08MEDIUM · OPEN

Entity jurisdiction boundaries unclear

F-09MEDIUM · OPEN

ISO 9001 edition transition — confirm, never auto-invalidate

F-10MEDIUM · OPEN

Systems & licensing entitlements unverified

Boundary probe log

  • Day 30 · A08 threshold → 403
  • Day 120 · A09 NIC → 403
  • Day 200 · A19 payment → 403
  • Day 300 · A16 hold-point → 403

Self-test guarantee

25 agent tests + 7 boundary negatives = 32/32 pass, runnable on any schedule from CI or cron against the local runtime.

python3 cgc_agents_api.py --selftest

Human authority

Terminal by design. No agent signs, spends, submits to authorities, releases construction or overrules a human. Status: PROPOSED — NOT DEPLOYED, review date fixed 2026-09-11.

No runtime? Take the packs instead.

All twenty-five agents are published as plain Markdown definitions you install in ChatGPT, Claude, Microsoft 365 Copilot or Cursor. Nothing executes here.

Go to the agent platform